STATUS : IN PROCESS OF CONSTRUCTION
EMPLOYER : GOVERNORATE OF BAGHDAD
LOCATION : BAGHDAD / AL HURIYAH
COST : 146.800..000.000 ID
COMPANY : GAINAA DUBAI CO. / RAYAT AL ALALAMAIN CO.
BID NO. : 13 /2013
Scope of work
60.000 M² / TOTAL SITE AREA
DESIGN AND WORK / TURN KEY
CAPACITY /400 BED PUBLIC HOEPITAL
REINFORCED CONCRETE / 56000 m³
STEEL STRUCTURE / 1000 ton
A HOSPITAL OF 400 BEDS AND ACCORDING TO THE (RFP) OF THE MOH .DESIGNED BY THE FAMOUS SPANISH ARCHITECT ENGINEER CALLED RAFAEL DE LA HOZ .
Recent works on the site on 18/4/2020
Recent works on the site on 18/4/2020
Recent works on the site on 20/3/2020
Recent works on the site on 6/3/2020
Recent works on the site on 17/2/2020
https://youtu.be/L4rXfbi3D9Q